Church & Dwight Cat Litter Mix Line
Manufacturing
$5.7M
19,600
– Structural and Mechanical Installation: steel process building, stair towers, conveyor bridges, and equipment supports
– Process Equipment Erection and Installation: mixers, day bins, bucket elevators, belt conveyors, screw conveyors, and ancillary components
– Fabrication and Installation: process piping, utilities, and material chutes
Sheetmetal, Insulators, Ironworkers
Johns Manville Pipe Insulation Plant
Manufacturing
$2.6M
15,600
– Process Piping and Utility Installation: cooling water, compressed air, natural gas, combustion air, process chemicals, and process water
– Installation: new air compressors, cooling towers, blowers, and pumps for facility expansion
Conklin Hall Dormitory, BGSU
Institutional
$1.4M
3,000
– Installation: New Central Rooftop and associated duct work shafts to each floor, and exhaust fans at both ends
– Additional Dorm Upgrades: Fire Alarm System, Chilled Water Upgrades, General Trades Upgrades to Central Rooms
– Additional Information: This project was completed in the three summer months when the dorm was unoccupied. Titan completed the project on time with thorough planning and precise execution, making it available for use for the Fall Semester.
– Duct Work, Structural Steel, Interior Trades, General Trades, Electrical, Fire Alarm Systems, Insulation, Refrigeration, and Excavation
Brenntag Chemical Distribution Plant PH1 & PH2
Chemical
$3.7M
17,000
Phase 1
– Installation: new indoor rail unloading stations, chemical distribution piping, a series of pumps & tanks designed to transfer chemicals to individual totes & drums
Phase 2
– Tank Farm Construction: new outdoor tanker loading/unloading stations, 30,000-gallon storage tanks, and an intricate network of pumps & piping to manage a wide-range of chemicals—from highly corrosive acid & caustics to flammable solvents
– The piping systems were constructed using various materials, including stainless steel, carbon steel, Fiberglass, PVDF, HDPE, PTFE-lined steel, and polypropylene, ensuring durability and compatibility with the diverse chemical compositions
Sheetmetal, Insulation
Ridge Street Tunnel, BGSU
Institutional
$3.7M
2,000
– Excavation of tunnel top to expose walls for tunnel repairs, followed by full replacement of tunnel top, tunnel and underground piping
– Exterior Waterproofing
– Installation: 2 each, 14" underground chilled water lines
– Backfill and Flatwork Repairs: pavement, concrete curbs, sidewalks, topsoil, hydroseeding, and irrigation repairs
– Concrete, Paving, Excavation, Irrigation, Traffic Control, Insulation, Landscaping, Abatement, Tempreture Controls, Testing & Balancing, Electrical
LyondellBassell Thermal Oxidizer
Manufacturing
$200,000
1,200
– Procurement of equipment
– Uncrate & sort
– Assembly of all 32 sections
– Installation of refractory and internal insulation
– Set blowers
– Equipment foundations
Concrete, Foundation
Seneca Petroleum
Petrochemical
$400,000
1,700
– BIM Design: green space 6" process lines, pipe supports, and foundations
– Layout and design of 6" process headers
– Design and Fabrication: returning condensate back to the boiler house
– Steam heat trace on all new fabrication
– Titan Fabrication fabricated from developed BIM model drawings, crafted by VDC Manager
Insulator, Concrete, Foundation
Wolfe Hall Research Lab, University of Toledo
Institutional
$1.3M
2,000
– Structural Additions: structural steel
– Installation: 3 exhaust fans, associated duct work, heat recovery piping
– Structural Steel, Cranes, Ductwork, Insulation, Equipment Deliveries
IMCO Carbide
Manufacturing
$1.8M
7,000
– Rough Plumbing: bathrooms locker rooms, and trench drains
– Installation: 10" & 12" coolant lines throughout production, 4" high-pressure gas lines, 3" compressed air main, and water heaters–facility-wide
– Set: VoMatt oil filters, air compressors, dryers, and air receivers
Insulator, Testing & Balancing
Tessenderlo Kerley, Inc Fertilizer Plant
Manufacturing
$16M
44,000
– Fabrication: Stainless Steel, Carbon Steel, PVC, and Fiberglass piping
– On-Site Installation: 30,000LF of Stainless Steel, Carbon Steel, PVC, and Fiberglass piping
– Equipment Setting: vessels, tanks, pumps, and specialty equipment
Insulator, Coatings, Grouting, Pump Alignments, Cranes
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. it enim ad minim veniam,
Lorem ipsum dolor sit amet, consec adipisicing elit, sed do eiu tempor incididunt ulabo dolore magna aliqua. Ut enim ad
David Markers
Co-founder
Lorem ipsum dolor sit amet, consec adipisicing elit, sed do eiu tempor incididunt ulabo dolore magna aliqua. Ut enim ad
David Jection
Designer